TILING OVER NEWLY SCREEDED CONCRETE

Always leave a newly screeded concrete floor for at least a month before covering it with floor tiles. This gives the floor time to dry out thoroughly. If the tiles are laid before this, the mortar bedding which is used as a key for the tiles may fail.

Leave a Reply

Your email address will not be published. Required fields are marked *